• Companies
  • Contact
  • Français
  • Search icon
Logo Roctest
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About Us
      • News
      • Events
      • Careers
      • Contact
Close icon Close icon Logo Roctest
  • Search icon
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About Us
      • News
      • Events
      • Careers
      • Contact
  • Companies
  • Contact
  • Français
  • Logo linkedin
  • Logo youtube
Home » Case studies » Alptransit Buttresses

Alptransit Buttresses

Published on January 23 2017
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

To optimise the support and confining structures in this area, SMARTEC SA was asked to install SOFO sensors to monitor the buttresses at the tunnel entrance and the concrete lining inside the tunnel.

Image Alptransit Buttresses

Short Description:
Switzerland is currently building a new railway line across the Alps. The Alptransit project is intended to make goods transport more economical and passenger transport faster (up to 250 km/h). The most impressive works of this new line will be the Gotthard base tunnel with its two tubes of 57 km each. The construction of these tunnels presents unparallel challenges due to their exceptional length and the difficult geological conditions found in some areas along the route. The Gotthard base tunnel must pass through a vast range of layers, from the very hard Gotthard granite, through the high-stress pennine gneiss of the Leventina, to the butter-soft rock of the Tavetsch Intermediate Massif.One of the difficult areas is the south portal in Bodio. Due to constraints in the layout of the tunnel and the necessity to cope with the existing railway line, highway and roads, it is necessary to build the portal and the first 300m of tunnel in a loose stone formation.

Aim of monitoring:
To optimise the support and confining structures in this area, SMARTEC SA was asked to install SOFO sensors to monitor the buttresses at the tunnel entrance and the concrete lining inside the tunnel. The sensors give quantitative information on the real loads that are carried by these structures in the short and long term. An automatic monitoring system records deformations and temperatures continuously and enables a correlation with the different construction phases.

INSTALLATION PERIODTYPE OF SENSORSNUMBER OF SENSORS
2001SOFO10

Main results:
The results have been analysed and used to support decisions on the design of the reinforcement structures during the works.

Image

General view of the buttresses

Image

Sensor installation in one buttress

Down arrow
close

Search Roctest

Searching...

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Legal
  • Privacy Notice – May 2018
  • Terms and Conditions of Sales
  • Sitemap
Follow us
  • Logo linkedin
  • Logo youtube
Logo Logo