• Companies
  • Contact
  • Français
  • Search icon
Logo Roctest
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About Us
      • News
      • Events
      • Careers
      • Contact
Close icon Close icon Logo Roctest
  • Search icon
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About Us
      • News
      • Events
      • Careers
      • Contact
  • Companies
  • Contact
  • Français
  • Logo linkedin
  • Logo youtube
Home » Case studies » Cable stayed bridge in Venice

Cable stayed bridge in Venice

Published on January 30 2017
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

To improve the knowledge of the bridge’s structural behavior, especially during the construction of the bridge, continuous monitoring was commissioned for the structure.

Image Cable stayed bridge in Venice

A new challenging cable-stayed bridge has been monitored since 2003 in the commercial harbour of Marghera (an industrial zone of Venice basin). The structure consists of seven spans with a total length of 424 meters: the main deck with two spans of 126 m and 105 m, plus 5 small spans, with lengths from 30 m to 42 m. The deck frame is made of steel and has a width of 24 meters.

Aim of monitoring:

To improve the knowledge of the bridge’s structural behavior, especially during the construction of the bridge, continuous monitoring was commissioned for the structure.  Of primary concern was failure in the precast slabs during the construction process. The fiber optic SOFO monitoring system, developed by SMARTEC SA (Manno, Switzerland), was chosen for this application. A total of 78 SOFO sensors, 4 SOFO inclinometers and several thermocouples were integrated on the bridge by our system integrator Tecniter Srl (Milan, Italy). Permanent static and a dynamic structural monitoring will be performed on the structure in order to provide data on the main steel deck, the 18 steel cables which support the load of the deck, and the tilted pylon antenna where the cables are anchored.

INSTALLATION PERIODTYPE OF SENSORSNUMBER OF SENSORS
2003 – 2005SOFO82
Image

SOFO Reading unit and optical switches

Image

Main bridge pylon under construction

Image

Bridge during cable-stays installation

Related Papers:

Fibre Optic Methods for Structural Health Monitoring, Branko Glisic and Daniele Inaudi, John Wiley & Sons, Ltd – 2007
Monitoring System for a Cable-Stayed Bridge using static and dynamic Fiber Optic Sensors, A. Del Grosso, A. Torre, D. Inaudi, G. Brunetti, A. Pietrogrande , 2nd International Conference on Structural Health Monitoring of Intelligent Infrastructure (SHMII-2’2005), Shenzhen, China, November 16-18 – 2005
Monitoring with Fiber Optic Sensors of a Cable-Stayed Bridge in the Port of Venice, A. Del Grosso, A. Torre, G. Brunetti, D. Inaudi, A. Pietrogrande , IABMAS’06 The Third Int’l Conference on Bridge Maintenance, Safety and Management, 16 – 19 July 2006, Porto, Portugal – 2006

Related Applications

Bridge

Down arrow
close

Search Roctest

Searching...

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Legal
  • Privacy Notice – May 2018
  • Terms and Conditions of Sales
  • Sitemap
Follow us
  • Logo linkedin
  • Logo youtube
Logo Logo