Commissioned by the municipality of Amsterdam, Max Bögl Nederland is building the Cuyperstrap in the monumental station building of Amsterdam Central, as part of ‘project De Entree’; Cuyperstrap will enable a dry transfer from train to metro station.
A structural monitoring system was installed in 2007 by Riga Technical University; at that time 21 SOFO long base deformation sensors and a measurement system for automatic crack monitoring were implemented. The monitoring system was upgraded in 2019
Smartec in collaboration with Politecnico of Turin has pervormed a series of crack detection tests in concrete beams using different types of distriuted optical fiber cables.
The two parallel outdoor penstocks of Perebella – Rosone are located near the “Parco Nazionale del Gran Paradiso” in Piemonte, Italy.
SMARTEC and its sister company TELEMAC have provided the reactor containment building’s monitoring system for the Finnish EPR in Olkiluoto since its early construction back in 2007. In January 2019 an engineering team from both companies participated