• Companies
  • Contact
  • Français
  • Search icon
Logo Roctest
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About Us
      • News
      • Events
      • Careers
      • Contact
Close icon Close icon Logo Roctest
  • Search icon
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About Us
      • News
      • Events
      • Careers
      • Contact
  • Companies
  • Contact
  • Français
  • Logo linkedin
  • Logo youtube
Home » Case studies » Cuyperstrap construction monitoring at Amsterdam Central Station, Netherlands

Cuyperstrap construction monitoring at Amsterdam Central Station, Netherlands

Published on November 28 2019
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

Commissioned by the municipality of Amsterdam, Max Bögl Nederland is building the Cuyperstrap in the monumental station building of Amsterdam Central, as part of ‘project De Entree’; Cuyperstrap will enable a dry transfer from train to metro station.

Image Cuyperstrap construction monitoring at Amsterdam Central Station, Netherlands

Fig.1 Impression of Cuyperstrap

The monitoring system consists of 2 inclinometer tubes to measure any deformations outside the construction pit. BouwRisk B.V. from Eindhoven has installed two PISA-M bi-axial in-place MEMS inclinometers from Smartec / Roctest.

The PISA-M in-place MEMS inclinometers combined with cellular modems enable to remotely and continuously monitor the lateral displacements of the soil. That way the construction process could be carried out without manual inclinometer measurements and with high precision of ±0.2 mm/m of lateral soil displacement at any time during the construction works.

Image

Fig.2 Data visualisation with monitoring software from Belgium company Vision42

Combing the PISA-M logger with monitoring software from Belgium data monitoring company Vision42, the end customer had total insight in the lateral soil displacement of the walls surrounding the construction site. Using the PISA-M in-place MEMS inclinometer with logger and cellular modem reduced the visits of the construction site to a limited number of times instead of performing numerous manual inclinometer measurements. Without the use of the PISA-M logger it would not have been possible to achieve this fact. The added value of using the PISA-M logger can clearly be defined on the basis of this project.

Image

Fig.3. In-Place-Inclinometers A and B - Measurements during construction works

Image

Fig.4 Inclinometer tube, In-Place-Inclinometer head and Logger enclosure

Image

Fig.5 In-Place-Inclinometer head

Related Applications

Geotechnical

Down arrow
close

Search Roctest

Searching...

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Legal
  • Privacy Notice – May 2018
  • Terms and Conditions of Sales
  • Sitemap
Follow us
  • Logo linkedin
  • Logo youtube
Logo Logo