• Compagnies
  • Nous joindre
  • English
  • Search icon
Logo Roctest
    • Produits
    • Applications
    • Services
    • Étude de cas
    • Ressources
    • À propos
      • À propos
      • Nouvelles
      • Évenements
      • Carrières chez Roctest
      • Nous joindre
Close icon Close icon Logo Roctest
  • Search icon
    • Produits
    • Applications
    • Services
    • Étude de cas
    • Ressources
    • À propos
      • À propos
      • Nouvelles
      • Évenements
      • Carrières chez Roctest
      • Nous joindre
  • Compagnies
  • Nous joindre
  • English
  • Logo linkedin
  • Logo youtube
Home » Étude de cas » CKS airport pavement

CKS airport pavement

Publié le 3 mars 2017
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

In order to obtain the actual joint movement along with seasonal temperature changes, SOFO sensors were installed in the middle of concrete slabs during the reconstruction process of some slabs at the taxiway N1 in January 2002.

Image CKS airport pavement

Taxiway N1 of Chieng Kai-Shek airport in Taiwan is considered as the primary one, which serves 42% of the departure aircrafts and 18% of the arriving aircrafts, approximate 26000 and 11100 operations annually each. It consists of number of rigid concrete blocks interconnected with joints.

Aim of monitoring:

In order to obtain the actual joint movement along with seasonal temperature changes, SOFO sensors were installed in the middle of concrete slabs during the reconstruction process of some slabs at the taxiway N1 in January 2002. Total of seven fifty-centimetres long sensors were embedded during the reconstruction works.

Main results:

Measurements were carried out continuously since embedding of sensors including the early age. Early age monitoring helped better understanding of behaviour of the young concrete just after the cutting the joint (acceleration of shrinkage). Long-term measurements increased the knowledge concerning the structural behaviour of the joint (max. and min. stressed determined), made possible correlation between temperature changes and strain and served as basis for development of very accurate joint movement prediction models.

INSTALLATION PERIODTYPE OF SENSORSNUMBER OF SENSORS
2002SOFO7
Image

View to CKS ariport gates and pavement

Image

Schema of SOFO sensors position in the pavement

Image

Monthly maximum, minimum and average readings of sensor 7 (joint monitoring) with air temperatures

Image

Comparison of predicted and measured joint movements

Image

Maximum, minimum and average concrete slab thermal stresses from February 2002 to January 2003

Related Papers:

Analysis of Concrete Joint Movements and Seasonal Thermal Stresses at the Chiang Kai-Shek International Airport, Chia-pei Chou, Hsiang-Jen Cheng, Shyh-tai Lin, 2004 FAA WORLDWIDE AIRPORT TECHNOLOGY TRANSFER CONFERENCE, Atlantic City, New Jersey, USA, April 2004 – (P-22) – 2004
Down arrow
fermer

Recherche

En cours...

Logo Roctest

Concepteur et manufacturier d’instrumentation géotechnique, structurale et d’équipements de test pour le sol et la roche

Logo Smartec

Concepteur et manufacturier d’instrumentation géotechnique, structurale et d’équipements de test pour le sol et la roche

Logo Telemac

Founisseur de solutions géotechniques et structurales depuis 1947

Logo Enomfra

Reconnaissance géologique, hydrogéologique
et géotechnique pour les projets les plus variés

Logo Roctest

Concepteur et manufacturier d’instrumentation géotechnique, structurale et d’équipements de test pour le sol et la roche

Logo Smartec

Concepteur et manufacturier d’instrumentation géotechnique, structurale et d’équipements de test pour le sol et la roche

Logo Telemac

Founisseur de solutions géotechniques et structurales depuis 1947

Logo Enomfra

Reconnaissance géologique, hydrogéologique
et géotechnique pour les projets les plus variés

Légal
  • Déclaration de confidentialité
  • Conditions générales de ventes
  • Plan du site
Suivez-nous
  • Logo linkedin
  • Logo youtube
Logo Logo